Providing reliable cost information for small to medium-sized projects up to a value of £275,000, this price book covers work within an existing building. Typically, this is where an increase in costs has been brought about by the reduction in output, smaller discounts, increased carriage, and increased supervision.

BCIS Alterations & Refurbishment Price Book 2024 – 29th edition

£144.00 exc. VAT

Providing reliable cost information for small to medium-sized projects up to a value of £275,000, this price book covers work within an existing building. Typically, this is where an increase in costs has been brought about by the reduction in output, smaller discounts, increased carriage, and increased supervision.

SKU: 19-023 Category: Tags: ,

The dataset in this price book is available online in our Schedule of Rates

To see the additional benefits of our online version and how it works, you can request a demonstration.

Call us on +44 0330 341 1000, or email contactbcis@bcis.co.uk

Request a demonstration

Reflecting the substantial increase in building alterations and refurbishment activity in the UK in recent years, this comprehensive price book provides more than 15,000 rates with build-ups for labour, plant and material costs. Rates are totalled to show a competitive and realistic total unit price, requiring only provision for profit and overheads to be added.

The data contained in this price book is intended for use on projects consisting entirely or substantially of alterations and improvements to existing buildings, from simply taking out a door and blocking up the opening, to comprehensive projects up to £275,000 in value.

Delivery: 5-7 working days

Published: September 2023

This edition includes fully reviewed and updated costs to reflect the realistic and competitive pricing levels predominant in this part of the construction industry.

What’s new in the 2024 edition:

Among 86 new rates and 144 resources, updates for the latest publication include:

  • Closed panel (Structural Insulated Panels) and open panel timber frame works in Approximate Estimate Rates for external walls.
  • New PVC-coated steel security grilles with PPC steel rails and associated fittings in Metalwork.
  • Vapour barriers and breathing membranes to external timber walls, PIR insulation fitted between joists / rafters / vertical studs and Structural OSB3 boards to external timber walls, all in Woodwork sundries.
  • Updated items in open type fencing, with full build-ups for chain link fencing, including anti-intruder fencing, post and wire fencing, chestnut pale fencing, wooden palisade fencing, wooden post and rail fencing. Similarly, newly updated full build-ups in close type fencing with close boarded fencing and woven wood fencing, and on fencing repairs.
  • In Gates, updated treated timber field gates, steel field gates, close boarded gates, palisade gates, and galvanised steel tubing gates, with build-ups for labour, plant and material costs.
  • I joists and posi or standard open metal web joists for use in domestic, commercial and flat roof settings in Woodwork boarding and flooring.
  • In Metalwork, individual and composite grade A, W40, PPC double-glazed steel windows.
  • Full build-ups in Asphalt Work for previously Specialist items in pavings and sub-floors, roofing, damp proofing and tanking.

Material supply costs and plant hire charges reflect national averages and are current at 2Q2023. The labour rates incorporate the latest wage agreements from BATJIC, JIB-PMES and the Electrotechnical JIB.

In order to reflect the more costly nature of alterations and refurbishment work, a plus rate has been incorporated into the hourly cost calculations.

Trade sections:

  • Demolitions
  • Excavations and Earthworks
  • Concrete Work
  • Brickwork and Blockwork
  • Underpinning
  • Rubble Walling
  • Masonry
  • Asphalt Work
  • Roofing
  • Woodwork
  • Structural Steelwork
  • Metalwork
  • Plumbing and Engineering Installations
  • Electrical Installations
  • Floor, Wall and Ceiling Finishes
  • Glazing
  • Painting and Decorating
  • Drainage
  • Fencing
  • External Works

Further sections include Approximate Estimating and guidance on Daywork, Preliminaries, and using location factors.

To download a sample of the 2024 edition, click here: